API 7K

API 7K Standards 2015 Edition


API Spec 7K (Drilling and Well Servicing Equipment) was last updated in 2010 in its Fifth Edition. It provides general principles and specifies requirements for design, manufacture, and testing of new drilling and well-servicing equipment and of replacement primary load-carrying components.

This specification is applicable to the following equipment:

  • rotary tables

  • rotary bushings

  • standard rotary slips designed for use in standard rotary bowls with a 33.333 cm/m (4 in./ft) API taper

  • nonstandard rotary slips without a taper of 33.333 cm/m (4 in./ft) for use in manual spiders as described in Item i)

  • high-pressure mud and cement hoses

  • piston mud-pump components

  • drawworks components

  • manual spiders that use standard rotary slips as described in Item c) that are not capable for use as elevators and are installed on or above the master bushing/rotary table

  • manual spiders that use nonstandard rotary slips not having a taper of 33.333 cm/m (4 in./ft) not capable of use as elevators, and installed on or above the master bushing/rotary table

  • spring, pneumatic, or hydraulic spiders with integral slips not capable for use as elevators and are installed on or above the master bushing/rotary table

  • spring, pneumatic, or hydraulic spiders with integral slips not capable for use as elevators and are installed in, or partly in, the rotary table

  • manual tongs

  • safety clamps not used as hoisting devices

  • power tongs, including spinning wrenches

  • blowout preventer (BOP) handling systems

  • pressure-relieving devices for high-pressure drilling fluid circulating systems

  • snub-lines for manual and power tongs

1 view0 comments

Recent Posts

See All

The Evolution of Mud Pump

The evolution of Mud Pumps: from Duplex to Quintuple Mud pumps  and their history are deeply entwined with the progression of oil...

Future of Drilling Equipment

The future of drilling equipment is expected to see more automation, robotics, and sustainability :  Autonomous drilling rigs These rigs...

Andy's words to his team

Dear All, 时光飞逝,转瞬间距离2025年元旦也就50天了。 年初立的目标实现了吗?这期间自己够努力吗?现在的工作有多卷,相信大家心里有数。 如通许波兵总这种职位,这种岁数,辗转于周边几个国家,每天都是几波会谈,不畏辛苦,客户所谈,一一记录,认真倾听,从他那里我看到...

Comments


bottom of page